Installation & Shipping
RoXteel does not install plenums directly. Every project receives a comprehensive installation guide, pick plans, rigging information, weights, pick counts, a dedicated project manager, first-install support, and ongoing installer question support.
10× Faster Erection
First tower normally takes approximately a couple of days. As crews learn the system, later towers can often be erected in less than a day. Expected cadence: approximately 2–3 sixty-foot towers per week. Approximately 90% less erection time and 90% less subcontractor labor hours versus conventional site-built discharge infrastructure.
Installation Support Package
RoXteel does not install plenums directly. On Arizona projects, sister company ATM Steel can potentially provide installation depending on schedule alignment.
Weights & Shipping
Two 20-foot sections per step-deck trailer load. 20-foot sections are designed for efficient shipping without pilot cars.
RoXteel is primarily the manufacturer. RoXteel supports project delivery planning and JIT scheduling. RoXteel does not own a national truck fleet, nationwide refers to capability and project reach, not logistics infrastructure.
Anchoring & Foundation
Anchoring
Anchor bolts or drill-and-epoxy anchors. Installed by client / installer, anchoring installation is not RoXteel's scope.
Foundation Reaction Loads
Foundation reaction loads are available through the genset packager / project partner. When working directly for a GC, RoXteel can provide them to the engineer of record.