RoXteel Industrial, An All Things Metal Company

Bitcoin Mining Steel Infrastructure & Modular Assemblies

RoXteel manufactures structural steel assemblies for Bitcoin mining infrastructure, including container and pod frames, stackable racks, cooling equipment supports and electrical skid frames. Built in Arizona for projects nationwide.

Structural Steel for Bitcoin Mining Containers, Cooling & Power Infrastructure

RoXteel manufactures the structural steel assemblies around Bitcoin mining deployments, designed to repeat across sites and phases. RoXteel does not supply mining computers or electrical and cooling equipment.

Mining Container & Pod Infrastructure

Repeatable structural frames for modular mining deployments.

  • Mining container and pod frames
  • Stackable container rack structures
  • Structural support for modular deployments

Cooling & Heat Rejection Infrastructure

Structural steel supporting cooling equipment at scale.

  • Dry cooler and radiator frames
  • Mechanical support structures
  • Equipment support assemblies

Power & Electrical Infrastructure

Structural frames for electrical equipment supplied by others.

  • Transformer skid frames
  • Switchgear skid frames
  • Electrical equipment structural frames
  • Utility support structures

Built Around the Deployment, the Site & the Delivery Plan

Container and pod frames follow 20 ft and 40 ft footprints, and racks can ship in sections. RoXteel plans assembly size together with fabrication, transportation and deployment sequence.

Partial Load

Smaller frames and skids can ship efficiently as part of a truckload.

Oversize / Modular

Stackable racks and larger assemblies can be planned as sections, modular shipments or a project-specific transport strategy.

Legal Truckload

Where the assembly allows, design can work around approximately:

8 ft 6 in
Legal width planning reference
48 to 53 ft
Trailer length planning reference
~45,000 lb
Legal truckload planning range

These are planning references, not published manufacturing limits. Final size and transportation strategy depend on the assembly and project.

Bring the Drawing. The Assembly. Or the Problem.

RoXteel reviews existing container frames, racks and skids for repeatable deployment, modularization, manufacturability, shipping and site setup. The goal is a design that repeats cleanly across a program.

  • Simplify the frame or rack
  • Improve manufacturability
  • Plan stacking and structural configuration
  • Plan for repeatable production
  • Improve shipping strategy
  • Reduce site work where practical

Designed for Repeatable Bitcoin Mining Deployment

Mining programs scale by repeating the same structure. RoXteel designs frames and racks for repeat production, so each unit ships and sets the same way.

20 ft / 40 ft
Container-type frame footprints
Ships in sections
Stackable racks planned for transport
Structure only
Steel assemblies, not mining or electrical equipment

Start With the Required Deployment Date

Bitcoin mining assembly lead time is quoted by project. It depends on design readiness, engineering requirements, materials, quantity, manufacturing sequence and transportation.

RoXteel starts with the required deployment date and works backward through design review, materials, production and transportation. Repeatable programs can standardize assemblies and plan production across multiple sites, phases or units.

Required Deployment DateDesign ReviewMaterialsProductionTransportation

Built in Arizona for Bitcoin Mining Projects Nationwide

RoXteel is based in Wittmann, Arizona and supports industrial projects across the United States from the 55 acre All Things Metal campus. RoXteel's approximately 60,000 sq ft manufacturing facility is currently under construction.

  • 55acres
    All Things Metal campus
  • ~60,000sq ft
    RoXteel manufacturing facility under construction
  • Nationwide
    Project support across the United States

Have a Bitcoin Mining Assembly, Drawing or Recurring Manufacturing Problem?

Bring us the frame, rack or program requirement. We will start with what you need to build and when.