What Information a Fabricator Needs Before Quoting
An accurate quote requires accurate information. Knowing what to provide helps buyers get faster, more precise pricing from a fabricator.
Book a Solution CallDrawings or Sketches
The most important input is drawings, CAD, Revit, or even hand sketches. The fabricator needs to understand the geometry, dimensions, and connections. Even rough drawings enable a preliminary quote; detailed drawings enable a precise quote.
Load Requirements
What loads must the assembly carry? Equipment weight, dynamic loads, wind, seismic, and any special loads. Load requirements drive the structural design, material selection, member sizes, and connection details.
Material & Coating Specifications
What material grade is required? What coating system, paint, galvanizing, or specialty? Material and coating specifications affect both cost and lead time. If specs aren't defined, the fabricator can recommend based on the application.
Quantity & Schedule
How many units are needed and when? Quantity affects per-unit cost, more units means lower per-unit cost through standardization. Schedule affects production planning and lead time. Both are essential for an accurate quote.
Site & Shipping Constraints
Where is the project site? What are the shipping constraints, access, distance, oversize permit requirements? Site constraints may affect the design, modular break points, lifting requirements, or installation sequencing.
What This Means for Your Project
Providing complete information, drawings, loads, materials, quantity, schedule, and site constraints, enables an accurate quote and faster response. RoXteel's Solution Call is designed to gather this information efficiently and start the Product Design review process.
Product Design Comes Before Manufacturing
Bring drawings, even rough ones. Product Design reviews them before steel is cut.
Book a Solution Call
Bring us the problem. Product Design reviews your assembly for manufacturability, weight, cost, and constructability, then builds it.
